Home | Arrange a seminar/webinar

Seminar/webinar icon

Seminars / Webinars

Our CPD seminars and webinars explain the practicalities and theory of using Invisible Connections’ products and are illustrated with real world examples.

Watch our webinar to the Institution of Structural Engineers (IStructE).

Webinar to the Institution of Structural Engineers (IStructE)

We were thinking how we could give the architect what they wanted: a finished landing with a shadow gap all around. We used the telescopic connection system from Invisible Connections, which made it a lot easier, both to install the wall recesses and to install the stairs.

Ali Solki, Project Engineer, A J Morrisroe 
Ali Solki, Project Engineer, A J Morrisroe

An issue with slipform is dragging. We always try to find solutions for fixing the casting elements robustly. Singular couplers are flimsy (just tied individually to the wall rebar), but coupler boxes are more robust and can resist that drag. COUPLER CADDi is a really good solution for slipform systems.

Ali Tayfun, Senior Engineer, Keltbray 
Ali Tayfun, Senior Engineer, Keltbray

In a slipform core, having several couplers in a box actually makes it easier and quicker to find. Just take off the lid and the couplers are exposed without any damage.

Ali Tayfun, Senior Engineer, Keltbray 
Ali Tayfun, Senior Engineer, Keltbray

We hadn’t typically gone the ‘specials’ route before. But, by investing a little upfront time to schedule our FERBOX requirements, we gained a smooth supply and installation process – without wastage or complication – and exceeded the programme demands of our slip-formed cores.

Adrian Paul, Project Manager, O’Keefe Construction (Greenwich) Ltd 
Adrian Paul, Project Manager, O’Keefe Construction (Greenwich) Ltd

Thank you for sending the calculations and installation advice. The new calculation software looks great. Very clear, user friendly and with more design checks than the previous version. It’s a pleasure to see how you are constantly improving.

Stefan Pauceanu, Senior Structural Engineer, Ground Construction Ltd 
Stefan Pauceanu, Senior Structural Engineer, Ground Construction Ltd

There’s no drilling, which of course involves manpower. And every drilling detail comes with resin, which is not cheap. The safety hazard of silica dust is an important consideration. Eliminating all of this gives the contractor a great advantage.

Florin Rotariou, Senior Engineer, Keltbray 
Florin Rotariou, Senior Engineer, Keltbray

Having FERBOX pre-sized is great from a quality and time-saving perspective, because if you use a regular continuity box, you end up having short lap lengths, depending on where you cut it. It goes back to your time spent fixing, looking for things, cutting them and having to retape corners and ends to stop concrete going in.

Ali Solki, Project Engineer, A J Morrisroe 
Ali Solki, Project Engineer, A J Morrisroe

Invisible Connections are an outstanding company to work with. Between Ross in sales and Derek on the technical side of things, iC have an offering which the rest of the market would do well to get close to. I can’t credit these two individuals enough for the support they have given me for both standard and bespoke FERBOX connections – some rather more complex than others!

Iain Harding, Project Manager, Keltbray Structures 
Iain Harding, Project Manager, Keltbray Structures

I’ve used your services on my last three projects (telescopic connectors for precast and continuity strip for in-situ). You’re very good at accommodating site demands for lead-in times and value competitiveness. Very happy with the service I’ve received on all three projects and hope this relationship will continue on future developments.

Paul Dean, Project Manager (Qcf), JP Dunn Construction Ltd 
Paul Dean, Project Manager (Qcf), JP Dunn Construction Ltd

As specialists in precast concrete car park construction, we use telescopic connectors for many key applications. Particularly, the BSF system helps us to construct a ‘modern’ frame without cumbersome corbel supports and enables rapid assembly on site. The technical back-up provided by Invisible Connections provides us with added reassurance.

Peter Crofts, Precast Design Manager, SCC Design Build Ltd 
Peter Crofts, Precast Design Manager, SCC Design Build Ltd

  ​   

 

  

  

© 2026 Invisible Connections Ltd | All Rights Reserved | Privacy Policy | Cookies

Invisible Connections, FERBOX and REDiBOX are registered trademarks