• +44 (0)1844 266000
  • sales@invisibleconnections.co.uk
  • technical@invisibleconnections.co.uk
Invisible Connections®
  • Home
  • Products
    • TSS and RVK Telescopic Connectors (Stairs)
    • DTS and BSF Telescopic Connectors (Structural Frame)
    • FERBOX (Reinforcement Continuity System)
  • Projects
    • Education
    • Health
    • Hotels
    • Industrial and infrastructure
    • Multistorey Car Parks
    • Offices
    • Residential
    • Retail
    • Sport and Leisure
  • Resources
    • Technical Literature
    • Product Drawings
    • Specification
    • Approvals
    • Environmental Product Declarations
    • Enquiry Forms
    • Videos
    • Case Studies
    • Published Articles
    • Seminars / Webinars
  • About
    • Meet the Team
  • News
  • Contact
Select Page
Ali Solki, Project Engineer, A J Morrisroe
Having FERBOX pre-sized is great from a quality and time-saving perspective, because if you use a regular continuity box, you end up having short lap lengths, depending on where you cut it. It goes back to your time spent fixing, looking for things, cutting them and having to retape corners and ends to stop concrete going in.
« Ali Solki, Project Engineer, A J Morrisroe Prev
Florin Rotariou, Senior Engineer, Keltbray Next »
  • Facebook
  • X
  • RSS

Designed by Elegant Themes | Powered by WordPress

We use cookies to monitor traffic on our website and ensure that we provide our customers with the best experience. Please read our cookie policy for more details on the cookies we use.